Design · EVOKE · Build · EVOKE · © ·
Design & Build · London
Loading...

Evoke Design & Build

Belgravia House

Status

Project Type

,

Flats/Units

2

Completion date

Apr 2025

Contract Value

500K

Project description

Evoke was appointed as the principal contractor for the delivery of Belgravia House, a bespoke new-build residential development situated on Balham High Road. The project involved the construction of two high-specification contemporary apartments, designed to maximize a prominent urban plot. This development showcases Evoke’s ability to manage end-to-end construction, from initial groundworks and structural assembly to high-end interior finishing.

Technical Execution & Modern Construction

As a new-build project, Belgravia House was engineered to meet the highest modern standards of thermal efficiency and structural longevity. Key technical elements included:

  • Structural Integrity: Implementation of a high-performance building envelope designed for urban longevity and superior acoustic separation between units.
  • Energy Performance: Integration of modern insulation and high-efficiency M&E services to ensure compliance with the latest Part L (Fuel and Power) Building Regulations.
  • Spatial Design: A precision-led internal layout optimized for the SW12 professional market, ensuring each of the two flats offers open-plan living and maximized natural light.

Urban Integration & Quality Assurance

Operating on a busy High Road required meticulous site management and logistical planning. Evoke ensured minimal disruption to the local area while maintaining an accelerated 8-month build program. The finished development stands as a benchmark for boutique residential construction, blending contemporary architectural lines with the premium fit-out quality that defines the Evoke brand.

Key Details

Media

Request more information