Evoke Management London Ltd

Finchley High road

Status

Project Type

,

Flats/Units

2

Completion date

Nov 2025

Contract Value

175K

Project description

Evoke was commissioned to undertake the comprehensive internal reconfiguration of the property at 766 High Road to create two high-specification residential flats. The project centered on a strategic architectural redesign to maximize the building’s footprint, transforming the existing layout into two distinct, self-contained living spaces. This required a deep understanding of urban density requirements and a focus on delivering modern, functional dwellings within an established North London streetscape.

Technical Execution & Compliance

The six-month program involved a total overhaul of the internal structure to ensure full compliance with current Building Regulations, particularly concerning Part E (Acoustic Insulation) and Part B (Fire Safety) for multi-unit dwellings. Our team managed the installation of independent utility metering, upgraded thermal envelopes, and modern M&E systems tailored for individual occupancy. The result is a seamless blend of contemporary interior design and structural integrity, delivering high-quality housing that meets the rigorous standards of the Finchley residential market.

Key Details

Media

Request more information