...

Hurdwick place

Project Summary

Timeline

JUL 2019 - MAR 2020

Type of Project

Internal Conversion

Flats

7

The project involves the internal conversion of an existing building to create seven contemporary flats. The development focuses on providing comfortable and stylish residential units while maintaining the character of the existing structure.

  1. Project Name: Hurdwick Place Flats
  2. Location:
    Address: Hurdwick Place, Camden, London, NW1
    Proximity: Situated in a prime location in Camden, close to Regent’s Park, Camden Market, and major transportation links including Camden Town and Mornington Crescent Underground stations.
  3. Project Scope:

This residential conversion project at Hurdwick Place aims to provide stylish and comfortable living spaces in a prime Camden location. The development combines modern amenities with sustainable practices, enhancing the local community and providing high-quality housing options.

  1. Architectural Design:
  • Architectural Firm: Evoke design & build
  • Design Philosophy: The design combines modern aesthetics with functional layouts to maximize space and comfort. Emphasis is placed on natural light, open-plan living areas, and high-quality finishes.
  • Materials: Sustainable, high-quality materials including energy-efficient windows, eco-friendly insulation, and modern fixtures and fittings.
  1. Flats Description:

Each flat is designed to offer a comfortable and contemporary living space, featuring:

  • Flat 1 to Flat 7:
    • Size: Ranges from 60 sqm – 80 sqm
    • Bedrooms: Mix of 1 and 2-bedroom units
    • Bathrooms: 1-2 per flat
    • Key Features: Open-plan living and kitchen areas, large windows for natural light, built-in storage solutions, and high-quality appliances.
  1. Amenities:
  • Parking: Secure parking options available for residents.
  • Security: Advanced security system with secure entry points and CCTV surveillance.
  • Green Spaces: Access to a landscaped communal garden, providing a tranquil outdoor space for residents.
  • Energy Efficiency: Incorporation of solar panels, energy-efficient heating and cooling systems, and LED lighting throughout.
  1. Construction Details:
  • Contractor: Evoke Design & Build
  • Project Timeline:
    • Start Date: January 2019
    • Estimated Completion Date: March 2020
  • Project Phases:
    • Pre-construction: Detailed planning, obtaining necessary permits, and procurement of materials.
    • Construction: Interior remodeling, installation of utilities, and interior finishing.
    • Post-construction: Final inspections, furnishing, and handover to residents.
  1. Sustainability Features:
  • Energy Efficiency: Use of energy-efficient building systems, insulation, and fixtures to reduce energy consumption.
  • Water Management: Installation of water-saving fixtures and appliances.
  • Eco-friendly Materials: Use of sustainable and non-toxic building materials and finishes.
  1. Community Impact:
  • Engagement: Regular updates and consultations with local residents and stakeholders to ensure community needs are met.
  • Benefits: Enhanced local property values, improved living standards, and contribution to the local economy through job creation and increased housing availability.

 

New Features

Other Portfolios

We're proud of the Same works

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.